§8454. Study of compliance problem of small electric utility systems
(a) Study
The Secretary shall conduct a study of the problems of compliance with this chapter experienced by those electric utility systems which have a total system generating capacity of less than 2,000 megawatts. The Secretary shall report his findings and his recommendations to the Congress not later than 2 years after the effective date of this chapter.
(b) Authorization of appropriations
There is authorized to be appropriated to the Secretary for the fiscal year 1979 not to exceed $500,000 to carry out the provisions of this section.
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (a), was in the original "this Act", meaning
The effective date of this chapter, referred to in subsec. (a), is the effective date of