§3952. Priority Louisiana coastal wetlands restoration projects
(a) Priority project list
(1) Preparation of list
Within forty-five days after November 29, 1990, the Secretary shall convene the Task Force to initiate a process to identify and prepare a list of coastal wetlands restoration projects in Louisiana to provide for the long-term conservation of such wetlands and dependent fish and wildlife populations in order of priority, based on the cost-effectiveness of such projects in creating, restoring, protecting, or enhancing coastal wetlands, taking into account the quality of such coastal wetlands, with due allowance for small-scale projects necessary to demonstrate the use of new techniques or materials for coastal wetlands restoration.
(2) Task Force procedures
The Secretary shall convene meetings of the Task Force as appropriate to ensure that the list is produced and transmitted annually to the Congress as required by this subsection. If necessary to ensure transmittal of the list on a timely basis, the Task Force shall produce the list by a majority vote of those Task Force members who are present and voting; except that no coastal wetlands restoration project shall be placed on the list without the concurrence of the lead Task Force member that the project is cost effective and sound from an engineering perspective. Those projects which potentially impact navigation or flood control on the lower Mississippi River System shall be constructed consistent with section 3953 of this title.
(3) Transmittal of list
No later than one year after November 29, 1990, the Secretary shall transmit to the Congress the list of priority coastal wetlands restoration projects required by paragraph (1) of this subsection. Thereafter, the list shall be updated annually by the Task Force members and transmitted by the Secretary to the Congress as part of the President's annual budget submission. Annual transmittals of the list to the Congress shall include a status report on each project and a statement from the Secretary of the Treasury indicating the amounts available for expenditure to carry out this chapter.
(4) List of contents
(A)
(i) identification, by map or other means, of the coastal area to be covered by the coastal wetlands restoration project; and
(ii) a detailed description of each proposed coastal wetlands restoration project including a justification for including such project on the list, the proposed activities to be carried out pursuant to each coastal wetlands restoration project, the benefits to be realized by such project, the identification of the lead Task Force member to undertake each proposed coastal wetlands restoration project and the responsibilities of each other participating Task Force member, an estimated timetable for the completion of each coastal wetlands restoration project, and the estimated cost of each project.
(B)
(C) Subsequent to the date on which the plan required by subsection (b) of this section becomes effective, such list shall include only those coastal wetlands restoration projects that have been identified in such plan.
(5) Funding
The Secretary shall, with the funds made available in accordance with section 3955 of this title, allocate funds among the members of the Task Force based on the need for such funds and such other factors as the Task Force deems appropriate to carry out the purposes of this subsection.
(b) Federal and State project planning
(1) Plan preparation
The Task Force shall prepare a plan to identify coastal wetlands restoration projects, in order of priority, based on the cost-effectiveness of such projects in creating, restoring, protecting, or enhancing the long-term conservation of coastal wetlands, taking into account the quality of such coastal wetlands, with due allowance for small-scale projects necessary to demonstrate the use of new techniques or materials for coastal wetlands restoration. Such restoration plan shall be completed within three years from November 29, 1990.
(2) Purpose of the plan
The purpose of the restoration plan is to develop a comprehensive approach to restore and prevent the loss of, coastal wetlands in Louisiana. Such plan shall coordinate and integrate coastal wetlands restoration projects in a manner that will ensure the long-term conservation of the coastal wetlands of Louisiana.
(3) Integration of existing plans
In developing the restoration plan, the Task Force shall seek to integrate the "Louisiana Comprehensive Coastal Wetlands Feasibility Study" conducted by the Secretary of the Army and the "Coastal Wetlands Conservation and Restoration Plan" prepared by the State of Louisiana's Wetlands Conservation and Restoration Task Force.
(4) Elements of the plan
The restoration plan developed pursuant to this subsection shall include-
(A) identification of the entire area in the State that contains coastal wetlands;
(B) identification, by map or other means, of coastal areas in Louisiana in need of coastal wetlands restoration projects;
(C) identification of high priority coastal wetlands restoration projects in Louisiana needed to address the areas identified in subparagraph (B) and that would provide for the long-term conservation of restored wetlands and dependent fish and wildlife populations;
(D) a listing of such coastal wetlands restoration projects, in order of priority, to be submitted annually, incorporating any project identified previously in lists produced and submitted under subsection (a) of this section;
(E) a detailed description of each proposed coastal wetlands restoration project, including a justification for including such project on the list;
(F) the proposed activities to be carried out pursuant to each coastal wetlands restoration project;
(G) the benefits to be realized by each such project;
(H) an estimated timetable for completion of each coastal wetlands restoration project;
(I) an estimate of the cost of each coastal wetlands restoration project;
(J) identification of a lead Task Force member to undertake each proposed coastal wetlands restoration project listed in the plan;
(K) consultation with the public and provision for public review during development of the plan; and
(L) evaluation of the effectiveness of each coastal wetlands restoration project in achieving long-term solutions to arresting coastal wetlands loss in Louisiana.
(5) Plan modification
The Task Force may modify the restoration plan from time to time as necessary to carry out the purposes of this section.
(6) Plan submission
Upon completion of the restoration plan, the Secretary shall submit the plan to the Congress. The restoration plan shall become effective ninety days after the date of its submission to the Congress.
(7) Plan evaluation
Not less than three years after the completion and submission of the restoration plan required by this subsection and at least every three years thereafter, the Task Force shall provide a report to the Congress containing a scientific evaluation of the effectiveness of the coastal wetlands restoration projects carried out under the plan in creating, restoring, protecting and enhancing coastal wetlands in Louisiana.
(c) Coastal wetlands restoration project benefits
Where such a determination is required under applicable law, the net ecological, aesthetic, and cultural benefits, together with the economic benefits, shall be deemed to exceed the costs of any coastal wetlands restoration project within the State which the Task Force finds to contribute significantly to wetlands restoration.
(d) Consistency
(1) In implementing, maintaining, modifying, or rehabilitating navigation, flood control or irrigation projects, other than emergency actions, under other authorities, the Secretary, in consultation with the Director and the Administrator, shall ensure that such actions are consistent with the purposes of the restoration plan submitted pursuant to this section.
(2) At the request of the Governor of the State of Louisiana, the Secretary of Commerce shall approve the plan as an amendment to the State's coastal zone management program approved under section 1455 of this title.
(e) Funding of wetlands restoration projects
The Secretary shall, with the funds made available in accordance with this chapter, allocate such funds among the members of the Task Force to carry out coastal wetlands restoration projects in accordance with the priorities set forth in the list transmitted in accordance with this section. The Secretary shall not fund a coastal wetlands restoration project unless that project is subject to such terms and conditions as necessary to ensure that wetlands restored, enhanced or managed through that project will be administered for the long-term conservation of such lands and waters and dependent fish and wildlife populations.
(f) Cost-sharing
(1) Federal share
Amounts made available in accordance with section 3955 of this title to carry out coastal wetlands restoration projects under this chapter shall provide 75 percent of the cost of such projects.
(2) Federal share upon conservation plan approval
Notwithstanding the previous paragraph, if the State develops a Coastal Wetlands Conservation Plan pursuant to this chapter, and such conservation plan is approved pursuant to section 3953 of this title, amounts made available in accordance with section 3955 of this title for any coastal wetlands restoration project under this section shall be 85 percent of the cost of the project. In the event that the Secretary, the Director, and the Administrator jointly determine that the State is not taking reasonable steps to implement and administer a conservation plan developed and approved pursuant to this chapter, amounts made available in accordance with section 3955 of this title for any coastal wetlands restoration project shall revert to 75 percent of the cost of the project: Provided, however, that 1 such reversion to the lower cost share level shall not occur until the Governor has been provided notice of, and opportunity for hearing on, any such determination by the Secretary, the Director, and Administrator, and the State has been given ninety days from such notice or hearing to take corrective action.
(3) Form of State share
The share of the cost required of the State shall be from a non-Federal source. Such State share shall consist of a cash contribution of not less than 5 percent of the cost of the project. The balance of such State share may take the form of lands, easements, or right-of-way, or any other form of in-kind contribution determined to be appropriate by the lead Task Force member.
(4) Existing cost-sharing agreements
Paragraphs (1), (2), (3), and (5) of this subsection shall not affect the existing cost-sharing agreements for the following projects: Caernarvon Freshwater Diversion, Davis Pond Freshwater Diversion, and Bonnet Carre Freshwater Diversion.
(5) Federal share in calendar years 1996 and 1997
Notwithstanding paragraphs (1) and (2), upon approval of the conservation plan under section 3953 of this title and a determination by the Secretary that a reduction in the non-Federal share is warranted, amounts made available in accordance with section 3955 of this title to carry out coastal wetlands restoration projects under this section in calendar years 1996 and 1997 shall provide 90 percent of the cost of such projects.
(
Editorial Notes
Amendments
1996-Subsec. (f)(4).
Subsec. (f)(5).